Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Fathi, M (2020) Public-private partnership contract framework development and project performance analysis compared to design-build in the US highway projects, Unpublished PhD Thesis, , University of Nevada, Las Vegas.

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects, Unpublished PhD Thesis, , University of Nevada, Las Vegas.

  • Type: Thesis
  • Keywords: construction cost; construction project; equipment; funding; project performance; weather; validation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2029971296
  • Abstract:
    Cost and schedule savings are the main measures of a project's success. Several factors affect the cost and schedule performances in a construction project, such as design changes, material, labor and equipment shortages, unpredictable weather conditions, and errors & omissions in contract documents. Some studies have shown that either the construction cost or the schedule performance of a project was dependent on the procurement factors, namely: bid cost, number of bidders, the bid cost deviation between the first and second bidder, the liquidated damage rate per day, the type of a contract, and the project location. However, a comprehensive study on the combined effect of procurement factors on performance metrics has not been yet conducted. Therefore, this study collected all the available contract procurement factors to determine the combined effect of these factors on the construction cost and the schedule performances. In addition, the multiple linear regression models within the study were developed to predict the performance metrics based on these factors. For this study, the project data completed between the year 2000 and 2016 were collected from two state department of transportations (DOTs): Texas and Florida. The results showed that not only cost growth but also schedule growth had a significant correlation between the liquidated damage rate per day, the type of a contract funding, the type of a contractor, and the location of a project. The validation process showed that the models developed during this study could predict project performance metrics accurately. Further research is recommended with more state DOTs data to check whether the relationships between the procurement factors and project performance metrics are similar to those found in this study.

Motaharikarein, S (2019) Development of natural perlite based concrete for sustainable construction, Unpublished PhD Thesis, , University of Nevada, Las Vegas.

Nikkhah Manesh, S (2020) Temporal and spatial analysis of the wage gap for women and underrepresented minorities in the architecture, engineering, and construction (AEC) workforce, Unpublished PhD Thesis, , University of Nevada, Las Vegas.

Sakhakarmi, S (2022) Automated approach for the enhancement of scaffolding structure monitoring with strain sensor data, Unpublished PhD Thesis, , University of Nevada, Las Vegas.

Shrestha, B K (2021) Relationship between standardization critical success factors (CSFs) and project performance, Unpublished PhD Thesis, , University of Nevada, Las Vegas.

Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities, Unpublished PhD Thesis, , University of Nevada, Las Vegas.

Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts, Unpublished PhD Thesis, , University of Nevada, Las Vegas.

Tafazzoli, M (2017) Dynamic risk analysis of construction delays using fuzzy-failure mode effects analysis, Unpublished PhD Thesis, , University of Nevada, Las Vegas.